Address:No. 4-4 East West Road, Jinhu County Industrial Concentration Zone, Huaian City, Jiangsu Province
Tel:0517-86918678
Fax:0517-86918679
Email:zhongweick@163.com
Post Encoding:211600
Flange globe valve belongs to forced sealing valve, so when the valve closes, pressure must be exert…
Description:
A brief introduction: J41W seriesFlange valveSealed valves are mandatory, so the valve is closed, the valve must exert pressure to force the sealing surface does not leak.When the medium into the valve six from the bottom of the valve, the operating force required to overcome the resistance, is the stem and the packing friction and pressure generated by the media thrust force than the valve off the valve opening force, so the diameter of the valve stem, otherwise it will bend the stem top of the fault. J41W seriesFlange valveThe body structure of straight through, DC and right angle type.Straight through is the most common structure, but its maximum fluid resistance.DC type fluid resistance small, used for containing solid particles or the viscosity of the fluid.Multi angled body with forged valve for smaller circulation, high pressure. Second, the operation principle and structure description: 1, the hand wheel clockwise, the valve stem moves downward, the valve closed down so that the sealing surface, will be cut off. The open pathway is reversed when the valve stem seal mentioned play the highest point. 2, the addition of a valve on the seal. In the valve open state, together with a filling layer sealing effect, and has certain protective effect on packing. 3, the nylon products for sealing, packing soft packing shape, the seal for the soft material, good sealing performance. Three,Flange valveThe characteristics of: 1, simple structure, manufacture and maintenance more convenient. 2, the working stroke is small, open and close a short time. 3, good sealing, the sealing surface between the friction force is small, longer life. Four, application: J41W series valve for medium natural gas, liquefied petroleum gas.This valve is used in the city of liquefied petroleum gas storage station, is also used in oil refineries, petrochemical plants, liquefied gas system of petrochemical factory, as the opening and closing device control medium cut. Five,Flange valveThe implementation of standards:
Design and manufacture
The length of the structure
Holen size
Pressure temperature Eagle
Test a test
GB12235
GB12221
GB9113 JB79
GB9131
GB/T13927 JB/T9092
Six, flange valve pressure test:
Nominal pressure
One point six
Two point five
Four
Six point four
Ten
Sixteen
strength test
Two point four
Three point eight
Six
Nine point six
Fifteen
Twenty-four
Water seal test
One point eight
Two point eight
Four point four
Seven point four
Eleven
Eighteen
The seal test
One point eight
Two point eight
Four point four
Seven point zero four
Eleven
Eighteen
Seal test
0.4-0.7
Seven, the main components of materials and properties:
Eight, the design and selection of ordering instructions: 1, the product name and model of the products of the nominal diameter of pressure material by the use of the medium temperature and products with the attachment so that we provide you the correct selection. 2, if you have special request, please specify when ordering products in. 3, if the unit has been selected by the design model, please press the model directly to our sales department order. 4, the occasion is very important when using more complex or the environment when you try to provide design drawings. Nine, customer service service commitment: 1, my company sold Zhongwei valve product quality problems within twelve months, responsible for free maintenance. 2, the warranty period if the products of our company have any quality problems, our company is responsible for free repair or replacement. 3, the warranty period if the user use undeserved, cause damage to the product, our company is responsible for the maintenance, collect the damaged parts cost. 4, after the warranty period of product quality problems, our company is responsible for the maintenance, collect the damaged parts cost. 5, if the user needs to our service, our company in the province of the user service personnel arrived at the scene within 12 hours, arrived at the scene 48 hours outside users.